Connect with us

Pakistan

60 percent work of 884MW Suki-Kinari Hydro Power Project completed

Published

on

BEIJING, May 8 (APP): The Suki Kinari Hydro Power Project woth US $ two billion being completed at a cost of US $ two billion under China-Pakistan Economic Corridor (CPEC) framework is expected to become operational by December 2022.

Around 60 percent work of the 884 MW hydro power project in Khyber-Pakhtunkhwa province has been completed. It has also achieved the second-stage river closure, entering a new phase of its dam construction, according to a report published by CEN.

Suki Kinari Hydropower Project is the largest independent hydro power producer in Pakistan, expected to generate 3,081 GWh million units per year.

The project is expected to increase power generation capacity by more than five percent. The Khyber Pakhtunkhwa government will earn approximately Pakistani 1.5 billion rupees per year water use in the form of royalty. The province will receive additional 113MW electricity in its share after completion.

Suki Kinari is a run-of-the-river largest private sector hydropower project located on Kunhar River in the Kaghan Valley of District Mansehra, Khyber Pakhtunkhwa. The project poses minimal environmental and social impact because it is a run-of-the-river project.

It is considered one of the most cost-effective hydropower schemes in the region due to its high design head of 900 meters and relatively short intake structure crest.

The Kunhar river originates and traverses through the whole length in Pakistani territory which ensures 100 percent uninterrupted flow through the project life. The project will generate maximum power for up to four hours daily.

This project is being supported and closely monitored by the governments of Pakistan and China due to its importance. Chinese company ‘China Gezgouba Group Corporation’ initiated the work on Suki Kinari Hydropower Project in 2017.

The project is being built on a “Build-Own-Operate and Transfer” basis in accordance with the Government of Pakistan’s Policy for Power Generation Projects 2002.

The total operational life of the project is 100 years and the company will hand over the Suki Kinari hydropower project to the Government of Pakistan after 30 years.

During this period, the company will be responsible for its maintenance and other expenditures.

The potential for energy generation from Kunhar River was first identified around 1960. In 1959, Charles T Main US consultants were engaged by the Water and Power Development Authority (WAPDA) to study this potential.

In January 1960, they issued a report entitled “Kunhar River Project-Kaghan Valley”. Further studies were conducted in 1984 and 1995 to optimize the power potential of Kunhar River.

These studies identified a series of potential sites along with the river from where the energy could be produced by cascading the water-energy through run-of-the-river hydro projects.

Studies suggested potential sites for these projects at Batakundi, Naran, Suki Kinari, Balakot and Patrind. Run-of-the-river project envisages that the water is drawn from the river, taken to the turbines in a powerhouse, located downstream through a tunnel and after running the turbines and producing energy, the water is again diverted back to the river.

This water is now again available to be used to produce energy through yet another similar setup downstream. This is called cascading. Unfortunately, no worthwhile efforts were made in the past on these hydro projects for producing electricity at affordable rates.

The project has provided around 5,000 local jobs and it will beautify the landscape, thus attracting more tourists to come and generate greater revenue.

Continue Reading

Pakistan

“Through Unity, Faith, and Discipline, We Rise from the Ashes, as Aik Qaum.”

Published

on

By

The APS (Army Public School) attack was a defining moment in Pakistan’s history. While the pain and scars will never fully heal, the resilience shown by the nation proves its unwavering determination to stand against terrorism. The martyrs of Army Public School are remembered as symbols of hope and courage, inspiring a better and more peaceful future for Pakistan.

“We will never forget, and we will never forgive.”

Continue Reading

Pakistan

Nation observes 10th Anniversary of APS Peshawar tragedy

Published

on

By

The 10th anniversary of the tragic terror incident at Army Public School Peshawar is being observed today to pay tribute to the martyrs.

Special prayers and Quran Khwani are being held for the martyred students and teachers of Army Public School.

Meanwhile, the Khyber Pakhtunkhwa education department has arranged special functions to commemorate the APS incident and martyred students.

On 16th of December 2014, six terrorists stormed the Army Public School Peshawar and martyred one hundred and forty-seven innocent students and teachers of the school.

Continue Reading

Pakistan

Chomos festival continues in Kalash Valley

Published

on

By

The historic fifteen-day Chomos festival continues in Kalash Valley, including Chitral district, on seventh consecutive day, today.

Under the guidance of Tashfeen Haider, Director General of the Khyber Pakhtunkhwa Culture and Tourism Authority, tourist information centers in Chitral City and Upper Dir have been activated to assist both foreign and local visitors.

The Kalash people are observing various rituals during the Chomos festival as part of their New Year celebrations.

Traditional songs, dances, and rituals are key features of the festival, which is set to culminate on the 22nd of this month.

Continue Reading

Most Popular

English اردو